Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Jul 12, 2022     Riveting the ribs to left main spar - (4.0 hours)       Category: Wings
Tonight, I started riveting the wing ribs to the left main spar. It took a few tries to get the first few rivets set satisfactorily, but once I got the technique figured out and got back in my rhythm it proceeded much more smoothly. There are 14 ribs (but the 1 outermost doesn't require riveting yet), and I did all but the innermost 3 ribs in this session.

While reading some VAF forum threads, I found one that revealed that I should have cut the short J-channel pieces a few days ago from the 8-foot stock rather than the 6-foot stock (which have a specific purpose later on in the fuel tanks). This means that I'll probably be ordering a new 6-foot section of J-channel prior to being able to finish the right-side fully.

What's next? I need to finish riveting those innermost 3 ribs, then retorque all of these bolts


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.